1715 Footbridge Looking West from Tower A
1715 Footbridge Looking West from Tower A
August 4, 1924
Photo of demilition and bridge construction in Philadelphia for the Benjamin Franklin Bridge
1902 St. George's Church, Phila Looking East
1902 St. George's Church, Phila Looking East
November 24, 1924
St. George's Methodist Church as it stood even with the ground during the construction of the Benjamin Franklin Bridge
2421 Bridge Roadway Reinforcing on Main Span East of Phila. Tower - Looking East
2421 Bridge Roadway Reinforcing on Main Span East of Phila. Tower - Looking East
October 8, 1925
Construction of the bridge reinforcing the roadway.
2435 Suspended Structure - Looking Southwest from Camden
2435 Suspended Structure - Looking Southwest from Camden
October 26, 1925
Suspended bridge structure with the city of Philadelphia in the background.
2474 Camden Approach East from Point St.
2474 Camden Approach East from Point St.
December 7, 1925
View of Pearl Street and the Benjamin Franklin Bridge with church.
2482 Camden Approach - Bridge Roadway and Beams for Sidewalk - Looking West from 4th St.
2482 Camden Approach - Bridge Roadway and Beams for Sidewalk - Looking West from 4th St.
January 29, 1926
Construction of the bridge roadway and the sidewalk.
2493 Bridge Roadway Slab - Looking West on Main Span
2493 Bridge Roadway Slab - Looking West on Main Span
February 15, 1926
In progress bridge roadway looking down towards the Philadelphia tower of the bridge.
2515 Inspection by Commission
2515 Inspection by Commission
March 19, 1926
Inspection crew and onlookers, Ralph Modjeski on left.
2519 Inspection by Commission
2519 Inspection by Commission
March 19, 1926
Bridge inspection crew crosses the bridge, led by a brass band. Some members of the party are carrying American flags.
2524 Bridge Inspection Party
2524 Bridge Inspection Party
March 19, 1926
Inspection crew and onlookers, Ralph Modjeski in the center.
2525 Governors Moore and Pinchot at Bridge Inspection
2525 Governors Moore and Pinchot at Bridge Inspection
November 24, 1924
Governors Moore and Pinchot shaking hands during the bridge construction.
2528 Suspended Structure - Looking Northest from Phila.
2528 Suspended Structure - Looking Northest from Phila.
March 19, 1926
Suspended bridge structure with the city of Philadelphia in the foreground.
2546 Paving Bridge Roadwat with Asphalt - Looking Northwest on Phila. Side of Main Span
2546 Paving Bridge Roadwat with Asphalt - Looking Northwest on Phila. Side of Main Span
April 28, 1926
Asphalt being rolled out along the bridge by several small steam rollers
2560 Entrance Camden Approach
2560 Entrance Camden Approach
April 29, 1926
Map of the Benjamin Franklin Bridge's approach to Camden
588 North Sixth Street, North Of Linden Street, Repaving Completed
588 North Sixth Street, North Of Linden Street, Repaving Completed
September 2, 1952
Completed repaving in the area excavated for the Benjamin Franklin Bridge toll houses.
602 Toll House Tunnel, at North Toll House
602 Toll House Tunnel, at North Toll House
March 11, 1952
Constrcuting the toll house tunnel for the Benjamin Franklin Bridge in Camden.
Aerial View Philadelphia and Camden
Aerial View Philadelphia and Camden
March 24, 1924
Birds eye view of the stucture supports being connected.
Aero-Directly Over Bridge
Aero-Directly Over Bridge
September 15, 1924
Birds eye view of the stucture supports being connected.
Aero-Looking From Camden to Phila.
Aero-Looking From Camden to Phila.
September 16, 1924
Birds eye view of the stucture supports being connected.
Approval of Location and Plans of Bridge
Approval of Location and Plans of Bridge
Taylor, Harry
September 21, 1921
Copy of the approval for the construction plans and location specifications for the bridge across the Delaware River (Benjamin Franklin Bridge), signed by Harry Taylor, Acting Chief of Engineers, on September 21, 1921, and subsequently by Jonathan Mayhew Wainwright, Acting Secretary of War, on September 26, 1921.
Architect's Drawing for Pylons at Phila. End of Bridge
Architect's Drawing for Pylons at Phila. End of Bridge
June 25, 1925
Proposed Drawing for Pylons
Bridge Over the Delaware River, Elevation Showing Positions of Caissons, Relative to Pier Head Line
Bridge Over the Delaware River, Elevation Showing Positions of Caissons, Relative to Pier Head Line
Delaware River Bridge Joint Commission
1921
Architectural plan for the caissons of the bridge over the Delaware River (Benjamin Franklin Bridge).
Bridge Over the Delaware River, Main Structure Plan
Bridge Over the Delaware River, Main Structure Plan
Delaware River Bridge Joint Commission
June 1, 1921
Architectural plan for the bridge over the Delaware River (Benjamin Franklin Bridge), showing the elevation of main structure. Plate IX.
Bridge Over the Delaware River, Map with Bridge Location
Bridge Over the Delaware River, Map with Bridge Location
Delaware River Bridge Joint Commission
September 1916
Map of the Delaware River showing the proposed location of the bridge connecting Philadelphia and Camden (Benjamin Franklin Bridge). Most of the map's detail is on the Camden side of the river. According to the imprint in the lower right corner, the map was published in Washington, DC, in September 1916, by the US Coast and Geodetic Survey.
Button: Campus Buildings and Ben Franklin Bridge
Button: Campus Buildings and Ben Franklin Bridge
1990 - 2005
Rectangular button with an artist sketch of Downtown Camden and the Ben Franklin Bridge with the Phialdelphia skyline in the background the the word "Rutgers Cadmen" in the upper right hand corner.
Cable Strand Test for Bridge over Delaware River Phila. PA.
Cable Strand Test for Bridge over Delaware River Phila. PA.
October 5, 1923
Cables being tested for installation.
Camden Anchorage Looking West
Camden Anchorage Looking West
February 28, 1924
Photo of the Anchorage Point in Camden
Camden Anchorage Site from Bairds Pier
Camden Anchorage Site from Bairds Pier
April 14, 1922
Photo of the Anchorage Point in Philadelphia
Camden Anchorage Site from Bairds Pier
Camden Anchorage Site from Bairds Pier
September 8, 1922
Photo of the Anchorage Point in Camden
Camden Approach to the Benjamin Franklin Bridge
Camden Approach to the Benjamin Franklin Bridge
1930 - 1939
Camden Approach to the Benjamin Franklin Bridge, with vehicles
Camden Demolition from Front St East
Camden Demolition from Front St East
March 31, 1924
Demolition in Camden for the Bridge
Camden Demoltion - East from 2nd St.
Camden Demoltion - East from 2nd St.
May 26, 1924
Demolition in Camden for the Bridge
Camden Granite Storage & Approach Pier Work Looking East from Delaware Ave.
Camden Granite Storage & Approach Pier Work Looking East from Delaware Ave.
October 24, 1924
Photo of the granite Storage in Camden at the foot of the Bridge.
Costs of Carrying Traffic Over Increased Height
Costs of Carrying Traffic Over Increased Height
Board of Engineers
1920
Memo discussing the costs of carrying traffic over increased height, pertinent to the construction plans for the bridge over the Delaware River (Benjamin Franklin Bridge).
Delaware Bridge Model
Delaware Bridge Model
December 2, 1922
3-D Bridge Model
Demolition - Philadelphia Fourth St. Looking West
Demolition - Philadelphia Fourth St. Looking West
March 14, 1924
Photos of Old City Demolition to make way for the bridge
Demolition Philadelphia Section "B"
Demolition Philadelphia Section "B"
March 7, 1924
Aerial shot of demolition projects in old city Philadelphia
Excavation & St. Augustine Church Phila. West of 4th St Looking Northeast
Excavation & St. Augustine Church Phila. West of 4th St Looking Northeast
October 27, 1924
Photo showing the St. Augustine Church and the demonlition and excavation process.
Foot Bridges Looking East from Cross Walk at Middle of Center Span
Foot Bridges Looking East from Cross Walk at Middle of Center Span
September 8, 1924
Photo of the footbridge
Foot Bridges Looking East on Foot Walk from Middle of Center Span
Foot Bridges Looking East on Foot Walk from Middle of Center Span
September 8, 1924
Photo of the footbridge
General View of Span Looking NW
General View of Span Looking NW
April 23, 1925
Image of Bridge nearing completion
Increased Cost for Increased Clearance
Increased Cost for Increased Clearance
Board of Engineers
1920
Memo discussing the increased price and length of the bridge for each additional foot of clearance. The memo does not list a date, but is presumed to be written circa 1920.
Large Blast Stone Mountain Quarry
Large Blast Stone Mountain Quarry
October 4, 1924
Photo of Granite Excavation and the Quarry workers in Georgia
N Front St Looking SE Showing Demolition Progress
N Front St Looking SE Showing Demolition Progress
April 27, 1922
Photo from the Bridge looking at the demolition on Front St.
Necessary Clear Height Under Bridges for Naval Vessels
Necessary Clear Height Under Bridges for Naval Vessels
Stocker, Robert
1920
Letter discussing the requirements of bridge clearance for naval vessels, pertinent to the construction plans for the bridge over the Delaware River (Benjamin Franklin Bridge).
New Toll Houses, Stairways "B" to "F"
New Toll Houses, Stairways "B" to "F"
September 30, 1952
New tollhouses going in at the Camden side of the Benjamin Franklin Bridge.
Official Crossing on Footbridge
Official Crossing on Footbridge
August 8, 1924
Engineering Inspection crossing the footbridge.
Official Crossing on Footbridge
Official Crossing on Footbridge
August 8, 1924
Engineering Inspection crossing the footbridge.
Phila Anchorage Site from Peir II
Phila Anchorage Site from Peir II
September 14, 1922
Photo of the Anchorage Point in Philadelphia
Phila Approach Looking East From 4th St
Phila Approach Looking East From 4th St
July 23, 1925
Approach Photo from Philadelphia
Phila. Approach Roadway Slab Looking Northeast from 4th St
Phila. Approach Roadway Slab Looking Northeast from 4th St
September 9, 1925
Approach Photo from Philadelphia
Phila. Demolition - 7th Floor Wilbur Building
Phila. Demolition - 7th Floor Wilbur Building
March 31, 1924
Photos of Old City Demolition to make way for the bridge
Phila. Demolition Northeast from 3rd St.
Phila. Demolition Northeast from 3rd St.
May 26, 1924
Demolition of Old City for the Bridge
Philadelphia Anchorage Looking Northwest
Philadelphia Anchorage Looking Northwest
September 27, 1923
Photo of the Anchorage Point in Philadelphia
Philadelphia Approach of the Benjamin Franklin Bridge
Philadelphia Approach of the Benjamin Franklin Bridge
September 1, 1921
Benjamin Franklin Bridge appraoch to Philadelphia, on paper with a newspaper clipping.
Plan of Farrand & Sharp's Proposed Bridge
Plan of Farrand & Sharp's Proposed Bridge
1813 - 1818
Rendering of an early 19th-century proposed plan for a bridge that would span part of the Delaware River from Camden to Windmill Island, opposite Philadelphia (Windmill Island was removed via dredging in the 1890s and no longer exists). Formally proposed in 1818, this bridge was never actually built. Another century passed before work on a bridge connecting Camden and Philadelphia actually started. This rendering may have been originally created as early as 1813, according to the information published by the Free Library of Philadelphia, where a copy of this rendering appears in the Castner Scrapbook.
Plans for approach of the Benjamin Franklin Bridge into Philadelphia
Plans for approach of the Benjamin Franklin Bridge into Philadelphia
May 12, 1921
Plans for the approach of the Benjamin Franklin Bridge done by the Board of Engineers in 1921.
Ratchets for Adjusting Strands at Main Towers
Ratchets for Adjusting Strands at Main Towers
November 24, 1924
Image of a ratchet used in one of the cables on the main towers.
Relation of Sailing Vessels to the Proposed Clearance
Relation of Sailing Vessels to the Proposed Clearance
Board of Engineers
1920
Memo discussing the heights of various sailing vessels entering the Port of Philadelphia. The memo advocates for capping the height of the proposed bridge over the Delaware River (Benjamin Franklin Bridge) at 135 feet and presents reasons why it would be a mistake to increase the bridge height to accommodate outdated tall sailing ships.
Sidewalk and Driveway at the North End of Police Buiding
Sidewalk and Driveway at the North End of Police Buiding
August 1, 1952
Construction workers repave the sidewalk and driveway at the Police Building
Sketch of the anchorage for the Benjamin Franklin Bridge
Sketch of the anchorage for the Benjamin Franklin Bridge
1920 - 1929
Exagerated artists sketch for a massive bridge anchorage, likely from the Benjamin Franklin Bridge construction in the 1920s.
Solar Eclipse
Solar Eclipse
January 24, 1926
Eclipse over Greater Philadelphia Area in 1925, taken during the Benjamin Franklin Bridge's Construction.
South Cable Looking East from Tower A
South Cable Looking East from Tower A
October 13, 1924
Photo of the footbridge
South Caisson Phila Anchorage Looking East
South Caisson Phila Anchorage Looking East
December 14, 1922
Photo of the Anchorage Point in Camden
Span Looking NE from Philadelphia
Span Looking NE from Philadelphia
April 23, 1925
Image of Bridge nearing completion
St. George's Methodist Church, 1769
St. George's Methodist Church, 1769
1920 - 1929
St. George's Methodist Church as it stood even with the ground before the construction of the Benjamin Franklin Bridge
Suspended Structure Looking West From Camden End of Main Span
Suspended Structure Looking West From Camden End of Main Span
July 30, 1925
Approach Photo from Camden
Working Chamber Caisson "B"
Working Chamber Caisson "B"
September 22, 1922
Workers under ground clearing space for the Caisson